LegionellaCompliance
Phase 1 of 9: Trigger AssessmentFacility & ASHRAE 188
Standard Facility Templates
Instant Auto-Fill

Standard 60-Bed Assisted Living

60-bed memory care & assisted living facility with central DHW loop (140°F storage / 124°F return), ASSE 1070 mixing valves (110°F–115°F), and resident hydrotherapy whirlpool tub with 30-min turnover.

120-Room Hotel with Tower & Spa

Full-service hospitality property with 120 guest rooms, central DHW boiler (140°F / 124°F recirc), HVAC cooling tower with biocide checks, CDC MAHC whirlpool spa with 30-min turnover & daily free chlorine/pH, decorative lobby fountain, and weekly distal tap flush SOP.

10-Story Commercial Office

Multi-tenant 10-story commercial office building with central DHW (140°F storage / 124°F return), rooftop cooling tower, breakroom ice machines, drinking water coolers, and Monday morning post-weekend stagnation flush SOP.

Facility Location

Determines regional water chemistry and environmental risk baseline.

For multi-building campuses, hospital pavilions, or connected towers.

Phase 1 of 9 · Part 1 of 3