Cooling Tower CoC Calculator & Filing Deadline Tracker
Calculate Cycles of Concentration (CoC), evaporation loss, and required blowdown rates, plus generate NYC Local Law 77, NYS Part 4, and ASHRAE 188 cooling tower filing & drift eliminator reminder packs.
Hot return temp minus cold supply temp.
Cycles of Concentration
Evaporation Loss
Required Blowdown
Maintaining proper blowdown rates prevents dissolved solids from precipitating as mineral scale. Scale insulates biofilm, allowing Legionella to survive chemical disinfection.
Cooling Tower Registration, Sampling & Drift Eliminator Deadlines
Select your jurisdiction and enter your last cleaning & Legionella sampling dates to compute upcoming statutory deadlines and export ready-to-import CSV or Calendar (.ics) reminders.
Verify pH, conductivity/CoC, biocide residual, and heterotrophic dip-slide count (<10,000 CFU/mL).
Qualified person inspects drift eliminators for gaps/fouling, nozzles, fill media, and basin sediment.
Collect representative basin sample via NYS ELAP-certified lab and log CFU/mL response actions.
Drain, mechanically clean wetted surfaces/basin, and apply hyperhalogenation disinfection per MMP.
Submit signed annual certification of inspection, cleaning, disinfection, and Legionella testing via the NYC DOHMH portal.
Stop Guessing. Start Controlling.
Now that you have your engineering numbers, let us automate the compliance. Build a complete, audit-ready ASHRAE 188 Water Management Plan tailored to your specific building topology in 15 minutes.
Live ASHRAE 188 Generator
Preview your ASHRAE 188 draft in 15 minutes (1 control point free) or start a 14-day trial.
Build Free ASHRAE 188 Plan12-Point Water Safety Surveyor Inspection Checklist
The exact verification protocol used by state health inspectors and CMS surveyors to audit ASHRAE 188 & 514 compliance, dead-leg flushes, and closed-loop CAPA records.